Emergency Structural Stabilization of the Historic Memorial Fountain

June 5, 2026 Version 1.1

This document is available to preview on this page. Public downloads are not enabled.

Document Details

Scroll through the document above to read all pages. Downloads are not enabled for public users.

Following a routine structural inspection identifying accelerated erosion on the base of the Historic Memorial Fountain, the Parish Clerk executed an urgent executive decision to authorize stabilization works in June 2024.

This rapid intervention bypassed the standard committee procurement window under emergency governance bylaws to prevent an irreversible structural collapse of the Grade II listed monument.

The allocated emergency funding of £3,800 covered the immediate installation of structural scaffolding and specialized lime-mortar masonry repairs. Three competitive quotes were obtained via emergency telephone consultations, with the contract awarded to a certified heritage restoration specialist.

This formal notice logs the emergency operational expenditure to maintain absolute transparency within our public finance tracking modules. A definitive structural safety report and budget reconciliation were subsequently presented to the full cabinet during their next ordinary session.

Document Information

Published

Author
Adekunle Ojeyemi
Last Updated
June 5, 2026

2

Total Downloads

Use the download options above the document to preview or save files.

Share