Infrastructure Delivery Plan 2025

April 27, 2026 Version 1.1

This document is available to preview on this page. Public downloads are not enabled.

Document Details

Scroll through the document above to read all pages. Downloads are not enabled for public users.

IDP for Local Plan 2025–2042. Transport: A428 junction improvement £4.2m (developer contributions/Highways England), active travel corridor £1.8m (Active Travel England), demand-responsive rural transport £620k (BSIP). Education: new 2FE primary school £8.5m (developer contributions/DfE) by 2029, secondary sixth form expansion by 2031. Health: GP surgery (NHS ICB, by 2028), pharmacy via planning condition. Green infrastructure: 22ha Country Park £3.1m. Utilities: National Grid reinforcement by 2027.

Document Information

Published

Format
DOCX
Author
Moses Joshua
Last Updated
May 6, 2026

5

Total Downloads

Use the download options above the document to preview or save files.

Share